Another step toward saving our Great Barrier Reef
Litter trap number two for Cairns Regional Council, installed in June 2009 at Moody Creek by James from Bandalong, crane operator Richard and DTE excavations.
This site has a tidal difference of around 1.5 metres and an approximate width of 25 metres. The litter shown in these pictures was collected even before we had completed the installation.
Shows that the Bandalong litter traps start working from the minute they hit the water.
The Bandalong Litter Trap floats on waterways, given buoyancy by exceptionally strong and durable polyethylene pipes. The unit is held in place by galvanised chains attached to ground anchors or fitted to rider poles for canal installations.
Bandalong International
Tel: +61 3 9465 1144
Fax: +61 3 9465 1244
